New Jersey State Library

New Jersey State Library

Library Development Bureau
   
Home :: LDB :: Construction :: basic steps planning

 

Construction Bond Fund:
Basic Steps in Planning for a New Library Building

I. PRELIMINARY STEPS

_____ Recognition of the need for a new building

_____ Alternative considerations

    _____building an addition
    _____ purchasing a building to be used as a library
    _____major renovation
    _____building a new building
    _____other (sharing space or other options)

_____ Appointment of a building committee

_____ Outline proposed program

_____ Investigate financial status

_____ Visit other libraries

_____ Plan for community input

II. DECISION TO BUILD

_____ Retain legal counsel

_____ Hire consultant to do library building program

_____ Undertake survey of community including focus groups

_____ Delegate specific responsibilities to individuals or groups

_____ Establish timeline

III. COMMUNITY ANALYSIS

_____ General characteristics of the population

    _____ Projected population growth in ten years

_____ Review of demographics and analysis

_____ Relationship to academic community and school community

_____ Relationship to cultural community

_____ Relationship to recreational community

_____ Future needs and general trends

_____ Special emphasis on problems

_____ Economic profile

_____ Special community needs

_____ Relationship of community to general region

IV. WRITTEN BUILDING PROGRAM

_____ Library objectives

_____ Existing and projected services

_____ Future needs of the library

_____ Standards required (ADA)

____ Interrelationships of spaces within the building, with reference to public use and staff use, utilizing flow charts and relationship charts and indicating priorities for contiguous location of spaces

    _____ Name of each space
    _____ Description of service function of each space and activities which take place
    _____ Number of occupants to be accommodated (patrons and staff)
    _____ Resources to be accommodated (books, tables, computers, etc)
    _____ Square footage requirements for each space
    _____ Current inadequacies
    _____ List of special features
    _____ Lists of movable furniture, equipment, and built in furniture and equipment
    _____ Community architectural preferences
    _____ Technology issues
    _____ Environmental considerations and special requirements if needed
    _____ Explanation of need for major renovation or expansion

V. HIRING OF THE ARCHITECT

_____ Develop a philosophy of architecture

_____ Become familiar with the architect's work

_____ Check for New Jersey license

_____ Check references and competence

_____ Design process of input to architect

_____ Sign contract

VI. DEVELOPMENT OF PLAN FOR FINANCING

_____ Estimate project cost

    _____site

      _____ site survey
      _____ bond sale
      _____ architect's fees
      _____ consultant fees
      _____ construction costs
      _____ mechanical costs
      _____ demolition
      _____ furniture and equipment
      _____ landscaping
      _____ owner's representative

    _____ clerk of the works

      _____ test borings
      _____ legal fees

    _____ Sources of funding

      _____ operating budget
      _____ bonds
      _____ gifts
      _____ mortgage
      _____ funding campaign

VII. ACQUISITION OF SITE

_____ Accessibility of site

_____ Relationship to existing city plan

    _____Visual prominence
    _____ Traffic patterns

_____ Soil conditions

_____ Zoning

_____ Parking

    _____ Centralized location

_____ Clear title

_____ Fair price

_____ Site survey

VIII. SCHEMATIC DESIGN

______ Floor plan

    _____ Elevation
    _____ Comparison with building program
    _____ Approval by governing body

IX. PRELIMINARY DRAWINGS

_____ Advanced drawings, elevation, etc.

    _____ Outline specifications for materials
    _____ Comparison with building program
    _____ Consult staff for suggestions

_____ Cost estimates

    _____ Approval by governing body

X. WORKING DRAWINGS AND SPECIFICATIONS

_____ Detailed drawings

    _____ Detailed specifications
    _____ Preparation of construction documents

XI. FURNITURE AND EQUIPMENT LIST

_____ Complete list

_____ Specifications

   
  Comments and questions to:
Tina Keresztury, Construction Bond Specialist tkeresztury@njstatelib.org
  Page last updated on: January 5, 2004
   
Click Here for Advanced Search Click Here for Search Tips